The idea is to simulate a second variant in which traffic flow is expected to increase by 2023.To simulate both scenarios within the same project we will proceed as follows:
We create a new group called Highways_2023, we doubled the roads of the Roads_2022 group (with the copy/paste buttons), we will change the name of traffic.
We create a new variant called Highways 2023:
We assign each group to each variant:
We calculate all the variants and observe the differences in each variant:
Variant Highways 2022:
Variant Highways 2023: